Step 1 – Determine FCC Rules that Apply
Determine if device is a Radio Frequency (RF) device subject to the FCC rules.
Determine all applicable technical and administrative rules that apply to the device requiring an equipment authorization.
The technical requirements are generally specified in the applicable FCC rule parts and the administrative rules are specified in 47 CFR part 2, subpart J.
Step 2 – Equipment Authorization Procedures
If a device is subject to FCC rules, determine the specific type of equipment authorization that applies to the device. Become familiar with all the basic marketing, equipment authorization, and importation rules. In some instances, a device may have different functions resulting in the device being subject to more than one type of approval procedure.
Determine the applicable equipment authorization procedure for your device.
Supplier’s Declaration of Conformity (SDoC)
Certification
Step 3 – Compliance Testing
Perform the required tests to ensure the device complies with the applicable technical requirements (as determined in step 1).
The qualifications of the testing laboratory used to demonstrate compliance is based on the approval procedure you are required to use (as determined in step 2):
Supplier’s Declaration of Conformity (SDoC)
Equipment approved using SDoC is required to be tested, however, it is not necessary to use an FCC-recognized accredited testing laboratory. However, as minimum the testing laboratory used is required to maintain a record of the measurement facilities as specified in Section 2.948 and a record of the measurements made as specified in Section 2.938.
Certification
Equipment approved under the Certification procedure is required to be tested by an FCC-recognized accredited testing laboratory. [For a list of currently FCC-recognized accredited testing laboratory see https://apps.fcc.gov/oetcf/eas/reports/TestFirmSearch.cfm]
Step 4 – Approval
After the testing is complete and your device is found to be in compliance, finalize the approval process based on the applicable approval procedure:
Supplier’s Declaration of Conformity (SDoC)
The responsible party, as specified in the rules, warrants that each unit of equipment complies with the applicable FCC rules.
The responsible party maintains all of the required documentation demonstrating compliance with the applicable FCC rules.
The responsible party prepares a compliance information statement to be supplied with the product at the time of marketing.
Certification
The responsible party, typically the manufacturer, obtains an FCC Registration Number (FRN) for a device requiring Certification. The FRN is a 10-digit number used to identify the individual or organization doing business with the FCC. The same FRN will be used for future approvals.
After obtaining an FRN, the responsible party obtains a Grantee Code from the Commission by applying at the Grantee Registration website. A grantee code is required the first time a party applies for certification, and can be used for all future approvals.
The responsible party files with a Telecommunication Certification Body (TCB) an application for a grant of certification. An application for equipment authorization requires submission of information about the product, as listed in Section 2.1033. The applicant must submit the required information to a TCB for review as part of the certification process. [For a list of FCC recognized TCBs see https://apps.fcc.gov/oetcf/tcb/reports/TCBSearch.cfm]
The TCB reviews all of the supporting information and the evaluation results to determine if the product complies with the FCC requirements.
Once the TCB makes a decision to certify the product the supporting information is uploaded to the FCC Equipment Authorization Electronic System (EAS) – Database.
A grant of certification is issued by the TCB on the FCC Equipment Authorization Electronic System (EAS) – Database.
Step 5 – Label/Manual/Record Retention
Label the product and provide the required customer information.
For more information see Labeling Guidelines – KDB Publication 784748.
Maintain all documentation as part of the responsibility for the retention of records and ensure that the manufactured products are in compliance.
Section 2.938 – Requirements for the retention of records of equipment subject to FCC approval.
Step 6 – Manufacture/Import/Market
When importing products into the United States, follow the FCC importation requirements.
Importation – Frequently Asked Questions.
Marketing of radio frequency devices prior to equipment authorization.
NOTE – Determining all applicable technical and administrative rules requires a technical understanding of the electrical functions of the device and an understanding of the FCC rules. For assistance, we recommend that you work with one of the FCC recognized accredited testing laboratories or TCBs. Questions can also be submitted through the Knowledge Database (KDB).
Step 7 - Modifications to approved products
Changes to your product design may require an additional approval. KDB Publication 178919 gives general guidance when making changes to a previously approved product. See the permissive change rules in Section 2.1043 for:
Modifications that may be made to an RF device without filing for a new equipment authorization;
Three different types of permissive changes; and Identifies when a permissive change filing with the Commission is required.
|