FCC - 设备授权认证程序 - Equipment Authorization Procedures

[复制链接]
查看18720 | 回复2 | 2017-12-13 20:44:59 | 显示全部楼层 |阅读模式

马上注册,结交更多电磁兼容工程师,享用更多功能,让你轻松玩转社区。

您需要 登录 才可以下载或查看,没有账号?注册会员

×
Title 47: Telecommunication

PART 2—FREQUENCY ALLOCATIONS AND RADIO TREATY MATTERS; GENERAL RULES AND REGULATIONS

Subpart J—Equipment Authorization Procedures


Contents
General Provisions
§2.901   Basis and purpose.
§2.906   Supplier's Declaration of Conformity.
§2.907   Certification.
§2.908   Identical defined.
§2.909   Responsible party.
§2.910   Incorporation by reference.
Application Procedures for Equipment Authorizations
§2.911   Application requirements.
§2.915   Grant of application.
§2.917   Dismissal of application.
§2.919   Denial of application.
§2.921   Hearing on application.
§2.923   Petition for reconsideration; application for review.
§2.924   Marketing of electrically identical equipment having multiple trade names and models or type numbers under the same FCC Identifier.
§2.925   Identification of equipment.
§2.926   FCC identifier.
Conditions Attendant to an Equipment Authorization
§2.927   Limitations on grants.
§2.929   Changes in name, address, ownership or control of grantee.
§2.931   Responsibilities.
§2.932   Modification of equipment.
§2.933   Change in identification of equipment.
§2.935   Electronic labeling of radiofrequency devices.
§2.937   Equipment defect and/or design change.
§2.938   Retention of records.
§2.939   Revocation or withdrawal of equipment authorization.
§2.941   Availability of information relating to grants.
§2.944   Software defined radios.
§2.945   Submission of equipment for testing and equipment records.
§2.947   Measurement procedure.
§2.948   Measurement facilities.
§2.949   Recognition of laboratory accreditation bodies.
§2.950   Transition periods.
Telecommunication Certification Bodies (TCBs)
§2.960   Recognition of Telecommunication Certification Bodies (TCBs).
§2.962   Requirements for Telecommunication Certification Bodies.
§2.964   Pre-approval guidance procedure for Telecommunication Certification Bodies.
Certification
§2.1031   Cross reference.
§2.1033   Application for certification.
§2.1035   [Reserved]
§2.1041   Measurement procedure.
§2.1043   Changes in certificated equipment.
§2.1046   Measurements required: RF power output.
§2.1047   Measurements required: Modulation characteristics.
§2.1049   Measurements required: Occupied bandwidth.
§2.1051   Measurements required: Spurious emissions at antenna terminals.
§2.1053   Measurements required: Field strength of spurious radiation.
§2.1055   Measurements required: Frequency stability.
§2.1057   Frequency spectrum to be investigated.
§2.1060   Equipment for use in the amateur radio service.
Supplier's Declaration of Conformity
§2.1071   Cross reference.
§2.1072   Limitation on Supplier's Declaration of Conformity.
§2.1074   Identification.
§2.1077   Compliance information.
Radiofrequency Radiation Exposure
§2.1091   Radiofrequency radiation exposure evaluation: mobile devices.
§2.1093   Radiofrequency radiation exposure evaluation: portable devices.

https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=304b4f78b00c28a605a0211dd6ef4854&mc=true&n=sp47.1.2.j&r=SUBPART&ty=HTML#sg47.1.2_11060.sg5
电磁兼容网 - 电磁兼容定制方案 www.emc.wiki - 欢迎您的技术讨论!
曾大侠 | 2017-12-13 21:05:12 | 显示全部楼层
FCC认证授权程序官方网站:

https://www.fcc.gov/engineering- ... pment-authorization
专注EMC电磁兼容整改! 联系电话 139 2899 3907
曾大侠 | 2017-12-13 21:19:37 | 显示全部楼层
Step 1 – Determine FCC Rules that Apply

Determine if device is a Radio Frequency (RF) device subject to the FCC rules.
Determine all applicable technical and administrative rules that apply to the device requiring an equipment authorization.
The technical requirements are generally specified in the applicable FCC rule parts and the administrative rules are specified in 47 CFR part 2, subpart J.
Step 2 – Equipment Authorization Procedures

If a device is subject to FCC rules, determine the specific type of equipment authorization that applies to the device.  Become familiar with all the basic marketing, equipment authorization, and importation rules. In some instances, a device may have different functions resulting in the device being subject to more than one type of approval procedure.

Determine the applicable equipment authorization procedure for your device.
Supplier’s Declaration of Conformity (SDoC)
Certification

Step 3 – Compliance Testing

Perform the required tests to ensure the device complies with the applicable technical requirements (as determined in step 1).

The qualifications of the testing laboratory used to demonstrate compliance is based on the approval procedure you are required to use (as determined in step 2):

Supplier’s Declaration of Conformity (SDoC)
Equipment approved using SDoC is required to be tested, however, it is not necessary to use an FCC-recognized accredited testing laboratory. However, as minimum the testing laboratory used is required to maintain a record of the measurement facilities as specified in Section 2.948 and a record of the measurements made as specified in Section 2.938.

Certification
Equipment approved under the Certification procedure is required to be tested by an FCC-recognized accredited testing laboratory. [For a list of currently FCC-recognized accredited testing laboratory see https://apps.fcc.gov/oetcf/eas/reports/TestFirmSearch.cfm]

Step 4 – Approval

After the testing is complete and your device is found to be in compliance, finalize the approval process based on the applicable approval procedure:

Supplier’s Declaration of Conformity (SDoC)
The responsible party, as specified in the rules, warrants that each unit of equipment complies with the applicable FCC rules.
The responsible party maintains all of the required documentation demonstrating compliance with the applicable FCC rules.
The responsible party prepares a compliance information statement to be supplied with the product at the time of marketing.

Certification

The responsible party, typically the manufacturer, obtains an FCC Registration Number (FRN) for a device requiring Certification. The FRN is a 10-digit number used to identify the individual or organization doing business with the FCC. The same FRN will be used for future approvals.
After obtaining an FRN, the responsible party obtains a Grantee Code from the Commission by applying at the Grantee Registration website.  A grantee code is required the first time a party applies for certification, and can be used for all future approvals.
The responsible party files with a Telecommunication Certification Body (TCB) an application for a grant of certification.  An application for equipment authorization requires submission of information about the product, as listed in Section 2.1033. The applicant must submit the required information to a TCB for review as part of the certification process. [For a list of FCC recognized TCBs see https://apps.fcc.gov/oetcf/tcb/reports/TCBSearch.cfm]

The TCB reviews all of the supporting information and the evaluation results to determine if the product complies with the FCC requirements.
Once the TCB makes a decision to certify the product the supporting information is uploaded to the FCC Equipment Authorization Electronic System (EAS) – Database.

A grant of certification is issued by the TCB on the FCC Equipment Authorization Electronic System (EAS) – Database.

Step 5 – Label/Manual/Record Retention

Label the product and provide the required customer information.
For more information see Labeling Guidelines – KDB Publication 784748.
Maintain all documentation as part of the responsibility for the retention of records and ensure that the manufactured products are in compliance.
Section 2.938 – Requirements for the retention of records of equipment subject to FCC approval.

Step 6 – Manufacture/Import/Market

When importing products into the United States, follow the FCC importation requirements.
Importation – Frequently Asked Questions.
Marketing of radio frequency devices prior to equipment authorization.
NOTE – Determining all applicable technical and administrative rules requires a technical understanding of the electrical functions of the device and an understanding of the FCC rules.  For assistance, we recommend that you work with one of the FCC recognized accredited testing laboratories or TCBs.  Questions can also be submitted through the Knowledge Database (KDB).

Step 7 - Modifications to approved products


Changes to your product design may require an additional approval.  KDB Publication 178919 gives general guidance when making changes to a previously approved product. See the permissive change rules in Section 2.1043 for:

Modifications that may be made to an RF device without filing for a new equipment authorization;
Three different types of permissive changes; and Identifies when a permissive change filing with the Commission is required.


专注EMC电磁兼容整改! 联系电话 139 2899 3907
您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

ITL

81

主题

37

回帖

526

积分

高级会员

积分
526

热心会员