马上注册,结交更多电磁兼容工程师,享用更多功能,让你轻松玩转社区。
您需要 登录 才可以下载或查看,没有账号?注册会员
×
加拿大IC在2015年8月28日前还可以用RSS-210出报告,在2015年8月28日以后,分为两种情况:
(1)用RSS-247出报告。
(2)在2016年8月28前用RSS-210出报告,但需要一份额外的报告作为补充RSS-247和RSS-210的差异部分。
(3)用RSS-247在2015年8月29日强制执行。
The purpose of this notice is to announce that Industry Canada is making the following modifications and clarifications to its requirements in RSS-247, Issue 1, Digital Transmission Systems (DTSs), Frequency Hopping Systems (FHSs) and Licence-Exempt Local Area Network (LE-LAN) Devices: Until August 28th, 2015, equipment will remain in compliance with the applicable RSS-210 requirements and be certified under either RSS-210 or RSS-247, as per the following: - If a Certification Body (CB) has issued a certificate to RSS-210 before the date of publication of RSS-247 (May 28th, 2015), nothing needs to be changed and it can be submitted as is and the CB would indicate RSS-210 in the application.
- If a CB has issued a certificate after the date of publication of RSS-247 (May 28th, 2015), and a test report was issued to RSS-210, the certificate and the certification application shall indicate RSS-247. Industry Canada will be accepting test reports performed to RSS-210 until August 28th, 2015. After August 28th, 2015, Industry Canada will only accept 1) test reports performed to RSS-247 or 2) a test report performed to RSS-210 dated one year from the date of certification until August 28, 2016 provided that it is supplemented with a partial test report to cover any missing RSS-247 requirement.
- INSERT New Section 3.3 – Emissions Falling Within Restricted Frequency Bands shall read as follows:
3.3 Emissions Falling Within Restricted Frequency Bands
Equipment certified under this standard is required to comply with the provisions in RSS-Gen with respect to emissions falling within restricted frequency bands. These restricted frequency bands are listed in RSS-Gen. - Section 5.4 2) (Transmitter Output Power and Equivalent Isotropically Radiated Power (E.I.R.P.) Requirements
2) For FHSs operating in the band 2400-2483.5 MHz, the maximum peak conducted output power shall not exceed 1.0 W and the e.i.r.p. shall not exceed 4 W. if the hopset uses 75 or more hopping channels; the maximum peak conducted output power shall not exceed 0.125 W and the e.i.r.p. shall not exceed 0.5 W if the hopset uses less than 75 hopping channels (see Section 5.4(5) for exceptions)
Official link:http://www.ic.gc.ca/eic/site/mra-arm.nsf/eng/nj00131.html
Listed below are the changes: - references to Federal Communications Commission (FCC) Knowledge Database (KDB) and American National Standards Institute (ANSI) standards for the measurement method of dynamic frequency selection (DFS) have been added;
- a measurement procedure to be used for verifying the compliance of equipment to the e.i.r.p. at different antenna elevations has been added;
- the digital technology of systems operating in the band 5725-5850 MHz that employ digital modulation or both digital modulation and frequency hopping technology is covered under the LE-LAN provision;
- requirements for LE-LAN equipment operating in the band 5725-5825 MHz have been modified and the frequency band for LE-LAN equipment has been extended from 5725-5825 MHz to 5725-5850 MHz;
- the unwanted emission limit for LE-LAN equipment operating in the band 5150-5250 MHz is determined outside the band 5150-5350 MHz instead of 5150-5250 MHz;
- the unwanted emission limit for LE-LAN equipment operating in the band 5250-5350 MHz is determined outside the band 5150-5350 MHz instead of 5250-5350 MHz;
- conditions to allow equipment in the band 5150-5350 MHz have been added;
- the DFS procedure for LE-LAN equipment operating in the bands 5250-5350 MHz, 5470-5600 MHz and 5650-5725 MHz has been modified;
- the requirement for in-service monitoring for equipment operating in the frequency bands 5250-5350 MHz, 5470-5600 MHz and 5650-5725 MHz does not apply to slave devices which do not have a radar detection mechanism;
- requirements have been added for LE-LAN devices operating in the 5 GHz band with bandwidths that overlap various frequency ranges within the 5 GHz band; and
- a requirement that all LE-LAN devices contain security features to protect against modification of software by unauthorized parties has been added.
Issued under the authority of
the Minister of Industry
________________________
Daniel Duguay
Director General
Engineering, Planning and Standards Branch
Official link: http://www.ic.gc.ca/eic/site/smt-gst.nsf/eng/sf10971.html
|