Authorization of Radiofrequency Equipment

[复制链接]
查看22624 | 回复0 | 2015-7-14 21:50:20 | 显示全部楼层 |阅读模式

马上注册,结交更多电磁兼容工程师,享用更多功能,让你轻松玩转社区。

您需要 登录 才可以下载或查看,没有账号?注册会员

×
The FCC has adopted rule changes in FCC Report and Order 14-208 which will become effective July 13, 2015. The FCC will no longer accept new applications for equipment authorization and will no longer recognize new 2.948 listed laboratories. Please see FCC 14-208 for details.  https://apps.fcc.gov/oetcf/eas/index.cfm
       1.PNG

A Rule by the Federal Communications Commission on 06/12/2015
ACTION: Final Rule.
SUMMARY:This document updates the Federal Communications Commission's (the Commission) radiofrequency (RF) equipment authorization program. The rules adopted by the Commission build on the success realized by our use ofCommission-recognized Telecommunication Certification Bodies (TCBs) and will facilitate the continued rapid introduction of new and innovative products to the market while ensuring that these products do not cause harmful interference to each other or to other communication devices and services.

2.950 Transition periods.
(a) As of July 13, 2015 the Commission will no longer accept applications for Commission issued grants of equipment certification.
(b) Prior to September 15, 2015 a TCB shall be accredited to either ISO/IEC Guide 65 or ISO/IEC 17065 (incorporated by reference, see § 2.910). On or after September 15, 2015 a TCB shall be accredited to ISO/IEC 17065.
(c) Prior to September 15, 2015 an organization accrediting the prospective telecommunication certification body shall be capable of meeting the requirements and conditions of ISO/IEC Guide 61 or ISO/IEC 17011 (incorporated by reference, see § 2.910). On or after September 15, 2015 an organization accrediting the prospective telecommunication certification body shall be capable of meeting the requirements and conditions of ISO/IEC 17011.
(d) Prior to September 15, 2015 an organization accrediting the prospective accredited testing laboratory shall be capable of meeting the requirements and conditions of ISO/IEC Guide 58 or ISO/IEC 17011. On or after September 15, 2015 an organization accrediting the prospective accredited testing laboratory shall be capable of meeting the requirements and conditions of ISO/IEC 17011.
(e) The Commission will no longer accept applications for § 2.948 test site listing as of July 13, 2015. Laboratories that are listed by the Commission under the § 2.948 process will remain listed until the sooner of their expiration date or July 13, 2016 and may continue to submit test data in support ofcertification applications for October 13, 2016. Laboratories with an expiration date before July 13, 2016 may request the Commission to extend their expiration date to July 13, 2016.
(f) Measurement facilities used to make radiated emission measurements from 1 GHz to 40 GHz shall comply with the site validation option of ANSI C63.4-2014, (clause 5.5.1a)1)) which references CISPR 16-1-4:2010-04 (incorporated by reference, see § 2.910) by July 13, 2018.
(g) Measurements for intentional radiators subject to part 15 of this chapter are to be made using the procedures in ANSI C63.10-2013 (incorporated by reference, see § 2.910) by July 13, 2016.
(h) Measurements for unintentional radiators are to be made using the procedures in ANSI C63.4, except clauses 4.5.3, 4.6, 6.2.13, 8.2.2, 9, and 13 (incorporated by reference, see § 2.910), by July 13, 2016.
https://www.federalregister.gov/articles/2015/06/12/2015-14072/authorization-of-radiofrequency-equipment
专注EMC电磁兼容整改! 联系电话 139 2899 3907
您需要登录后才可以回帖 登录 | 注册会员

本版积分规则